Gold Standard

Consultation

Animal manure management and biogas use for thermal energy generation (AWMS) v.2.0

  • Consultation Period 22 Dec 2025 - 05 Feb 2026
  • Submission Deadline 05 Feb 2026
Animal Manure Consultation Image cover

Gold Standard is pleased to open a public consultation on Version 2.0 of the Methodology for Animal Manure Management and Biogas Use.

Key Highlights:

·       Paris Alignment: Integrates mandatory "Downward Adjustment Factors" (DAF) to align project baselines with host country Net-Zero targets.

·       Baselines: Standardises quantification using IPCC approaches and Methodology standards prescribing PAA requirements.

·       Enhanced Safeguards: Introduces rigorous checks for digestate management to prevent downstream leakage.

Transition for Existing Projects: We have developed a pragmatic transition framework to support current project developers:

·       Gap Validation: Projects transitioning mid-crediting period undergo a targeted review focusing only on new requirements, avoiding full re-validation.

·       Evidence-Based Updates: The update is supported by a Supplementary Information package, which details the peer-reviewed scientific literature underpinning the new leakage factors, embodied emissions defaults and lock in Risk Analysis

Documents under Consultation

  • Animal manure management and biogas use for thermal energy generation - AWMS
  • Supplementary Information - Animal manure management and biogas use for thermal energy generation AWMS
  • Animal manure management and biogas use for thermal energy generation - Validation and Verification for Consultation

Submission process

Please fill the form accessible below before the 5 February 2026 at 18:00 (CET)